Buffalo & Pittsburgh - Bridge 433 Upgrade

TEC designed the repairs and trestle replacement at bridge 433 in Chicora, Pennsylvania. To increase track capacity to a gross car weight of 286 kips, the timber trestle was replaced with steel. This project was completed with one bent being driven per day between train traffic; this allowed the railroad to stay open during construction.

Previous
Previous

Portland Yacht Club - Gangway Lifting Gantry